Saturday, 3 November 2018

Concrete dub


Geoff fresh from being dub dj, and Jess.
Today we were at Wholestone Moor, looking down on the M62, and wishing the wind would die down a bit. We were removing guards from previous planting, to re-use at this site.

We were: Geoff, Ben, Dave, Sue, Jess, Dianne and Lizzie the dog, Cath, Jason, Mel, myself, Hap and Adrian.

2 cakes, jam sponge from the President, and luxurious fruit cake from Jason, plus emergency jaffa cakes from Dianne, and grapes from Hap.

We left approx 300 guards and 200 stakes at the first collection point. And roughly half that number a tthe second, furthest, point. With a bit more scrounging around we will have enough to do this season's planting up there with reclaims. We will need to take 60 shrub guards up for the holly, and 60 of the new mesh pine guards.

Me pointing at pointy sticks.


https://youtu.be/M3lYlTeJC34